Skip to content
Fort Lauderdale, FL · Licensed across FloridaMon–Fri 10:00 AM – 6:00 PM · (954) 807-3208
Romco BuildersCall

What we build · Outdoor Play

The Requirement That Caps Your Capacity

The outdoor requirement is frequently the binding constraint on licensed capacity, and it is the one operators check last.

The site, the age groups, and the capacity your model needs. We will tell you whether the building and the outdoor space can support it.

Capacity

Decided by the building, not by the business plan

Outdoors

Play area frequently caps licensed capacity, not the building

Licensed

We build to what the licensing authority requires

Licensed

General contractor, licensed in the state of Florida

Indoor capacity means nothing without outdoor space

A building with enough classroom area for a hundred children and an outdoor play area that supports sixty licenses for sixty. On an urban or infill site that is the constraint that decides whether a deal works, and it is measurable from a survey before anybody signs anything.

What the outdoor area needs

  • Area per child, to the licensing requirement.
  • Fencing of the specified height and construction, fully enclosing.
  • Impact-attenuating surfacing under equipment.
  • Shade, which in Florida is a practical necessity as well.
  • Direct or supervised access from the classrooms.

How we handle it

  1. 01Measure the achievable outdoor area before anything else.
  2. 02Build fencing to the specified height and construction.
  3. 03Install surfacing to the equipment requirements.
  4. 04Provide real shade, sized for the Florida sun.
  5. 05Design access so children do not cross uncontrolled space.

Measure the outdoor play area before you look at the building. It caps licensed capacity more often than the classrooms do, it is visible on a survey, and it is the number that determines whether a site can support the business plan.

Said plainly

Where we stop

Outdoor area cannot be created where the site does not have it. Where the play space caps capacity below what the model needs, we will say so during due diligence rather than after the lease.

FAQ

Common questions

What usually caps licensed capacity?
The outdoor play area, more often than the classrooms.
When should we check it?
Before the building. It is visible on a survey.
Does shade matter?
In Florida it is both a requirement consideration and a practical necessity.
Can outdoor area be created?
Not where the site does not have it. It is a hard constraint.

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.