Capacity Is a Building Question

Romco Builders is a licensed Florida general contractor. On a child care center, the building decides the enrolment and the enrolment decides the business.

The site, the age groups, and the capacity your model needs. We will tell you whether the building and the outdoor space can support it.

Capacity

Decided by the building, not by the business plan

Outdoors

Play area frequently caps licensed capacity, not the building

Licensed

We build to what the licensing authority requires

Licensed

General contractor, licensed in the state of Florida

Why we start with the site

Licensed capacity is the lowest of several constraints — usable indoor area, outdoor play area, restroom counts, egress — and on most urban sites the outdoor area binds well below what the building could hold.

That is measurable from a survey in minutes. It is also the number the entire business model rests on, and it is routinely established after a lease is signed.

We build to the requirements; we do not interpret them

A licensing consultant and the authority determine what applies. We build to it exactly, because a fence height, a fixture count or a finish that is nearly right fails an inspection that has to pass before a center can open.

We will not substitute a commercial finish for one specified to meet a licensing or safety requirement.

Finishing early enough to be inspected

An inspection that identifies items to correct is normal rather than a failure. The program has to complete construction early enough that correcting them does not move the opening date families were given.

Those families have arranged childcare around that date and given notice elsewhere, which makes it a harder date to move than most.

Licensing and the limits of this site

Romco Builders is a licensed Florida general contractor. Nothing here is regulatory advice; your licensing consultant and the licensing authority determine the requirements for your facility.

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.