What decides the site · Capacity

The Number the Business Plan Depends On

Licensed capacity comes from the building and the site, and it is the number every part of the business model rests on.

The site, the age groups, and the capacity your model needs. We will tell you whether the building and the outdoor space can support it.

Capacity

Decided by the building, not by the business plan

Outdoors

Play area frequently caps licensed capacity, not the building

Licensed

We build to what the licensing authority requires

Licensed

General contractor, licensed in the state of Florida

The plan is built on the wrong number

An operator models revenue on a capacity figure taken from the building area or from a similar center. Actual licensed capacity is the lowest of several constraints — indoor usable area, outdoor play area, restroom provision, egress — and it is frequently well below the assumed figure.

What limits capacity

  • Usable indoor area per child, by age group.
  • Outdoor play area, which is frequently the binding one.
  • Restroom fixture counts.
  • Egress capacity from each room and from the building.
  • Parking and drop-off, where a local requirement applies.

How we handle it

  1. 01Test all constraints, not just the indoor area.
  2. 02Report capacity as the lowest binding constraint.
  3. 03Show what would have to change to increase it.
  4. 04Give the figure before the lease or purchase.

Work out capacity as the lowest of all the constraints, not from the classroom area alone. An operator who models on indoor area and licenses on outdoor area has a business plan built on a number the site cannot deliver.

Said plainly

Where we stop

Capacity is what the building and site allow. We can show what would have to change to raise it and we cannot raise it by design alone where the site is the constraint.

FAQ

Common questions

How is licensed capacity determined?
The lowest of indoor usable area, outdoor area, restrooms and egress.
Which usually binds?
Outdoor play area, on most urban and infill sites.
Can capacity be increased?
Sometimes, by addressing the binding constraint. Not where the site itself is the limit.
When should we know the figure?
Before the lease or purchase.

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.